But someone has to do it!
Well that someone is me since it’s my layout. The factory units were chosen to be a good focal point on the layout but they also provide an interesting railway/industrial background.

These were the laser cut facory sections after they had received a coat of bauxite car primer. This really makes a great brick colour and coming in a larger tin, its good value too!
The windows are nicely cut from white card by laser but they are slightly discoloured by the laser so I painted all my windows again.

I think had had said in a previous blog page that I wanted some sections to be flush to the rear of the back scene and then some other sections just slightly further forward by about 15mm. To do this, I had to cut all the roof sections. Once these were all cut, I glued them into place. They were then painted with matt black paint once the glue was dry.
The laser cut panels feature stone window sills and arches at the tops of the windows. I wanted these to stand out so I started to paint these. Given the fact that I was having to cover a dar colour, the first coat of paint acted as an undercoat,

Having painted the first colour, I decided that I needed to purchase a slightly different colour, something that was a bt more of a ‘concrete/stone’ colour. Once the first coat (shown above) was dry, I added the second coat and painted the window sills again too.

Once the window arches had their second coat, I was really pleased. The lighter colour did stand out but I knew that some weathering would help to tone it down a bit.
I used Railmatch paints through my airbrush to weather the factory units. To begin with I used some Sleeper Grime as the base of the units would get dirty from the nearby track and trains. I also put a faint dusting of this colour over the window arches to show the grime that would run down the walls and over the window surrounds. I then mixed some matt black for some further weathering. I didn’t want to create a black factory so tried my best to give the units a light weathering effect around the roof sections, the windows and certain areas of brickwork. I gave a little more attention to where the panels join and these will have some guttering and pipe work added around there so I wanted this area to look a little bit more grubby.
There’s still a lot more work to do on the buildings. The signal box roof is coming on, but the roof tile paper is at work. It will also need weathering and the station building hasn’t had any more attention at all. What will I do about the insides of these buildings, I will almost certainly need to get a kit for the inside of the signal box…but that’s something for another day. Now where are those glazing strips…
I know how awkward it is to reduce buildings to 15mm deep! That’s exactly the size of th
LikeLike
Of the ones on bickersgate. My keyboard is playing up!