Wire! Oh Wire!

It needed to be done. I know that. I just wished that someone would come along and say ‘Oh what a lovely layout, let me wire up that double slip for you’. Alas it was my layout and so I have had to bodge the electrics like all my other layouts. One day, I will get one of my layout’s electrics installed properly. Maybe DCC…NO Not yet!

So folks. It is done, it does work and despite the masses of wires trailing down from the underside, the power does seem to go from A to B and every where else required.

a rather messy layout…

The control box is a product from Grange and Hodder. It was used on my previous layout so the top was unusable. I was able to cut a piece of hardboard to size – result! – one re-used control panel. I purchased some velco strip from my local supermarket and fitted a stip of it to the top underside of the fascia. If there is a problem with the layout’s control panel I can now easily remove the section that holds the switches and replace it when I’m finished.

The above picture doesn’t really give an impression that I was making progress but at this stage, I was nearly finished.

looking a bit grubby!

The control panel will be painted or covered with sticky back plastic soon to make it look presentable but for now, I’m enjoying the opportunity to play trains with my limited set up.

I’ve enjoyed the opportunity to run some of my bigger engines on the layout and check their running through all the track work. At the moment everything is running well and I’m a happy man….

Now, what shall I do next…

That DMU isn’t finished yet…

The wife has a new hot tub…….

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.