The ‘BIG THINGS’ take time..

Despite the urge to start on some scenic items such as ballast, I’m keen to get some of the bigger things ready first so I don’t have to scrape up ballast at a later stage. As I’ve said on previous ocassions, all of my buildings were made by the same company and this has provided a certain snese of consistency.

I’ve started to paint the station building, the canopies, the signal box and the factory units that will go behind the tracks on board No. 3. Using a cream and green paints, I painted the station building and signal box after picking out the window frames in white.

The station building really started to look good once some paint was added.

BEFORE PAINTING
DURING PAINTING

The signal box required quite a lot of painting in both cream and green. Due to absorbant nature of the wood, I had to paint some areas twice.

The building hasn’t been glazed yet, in fact none of the buildings have any windows yet. The glazing will be added once the buildings have been weathered.

While I will be able to stick the factory units in place quite soon, the signal box and station building will need to wait for other details to be added around those areas.

You can see that the roof sections have lines cut into them. I like to cut individual tiles from grey card and stick them on one by one. This sounds like madness but I really like the end result and it allows me to model things like a slipping slate.

The factory units are really lovely and go together well or work as a single unit. This one will be fixed at the edge of board No. 2 with the rest of the factory units on board No. 3 As you can see they need one more coat of paint around the windows before they are weathered. I want to add some gutters and down pipes however these won’t be added until the factory units are fixed into place. Finally, there’s one other detail I’ve added recently add that is a few yard lamps near the two main sidings. Theses are working lamps but I’m not sure if they’ll get used. I’m not fond of layouts which have lots of lights on during the day time when they wouldn’t be used.

There are lots of other ground level details to add at the moment and I will need crack on with these soon so that i can consider the weathering at some point. Despite all the best intentions, I can’t see any ballast arriving until the summer is over.

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.